ARMY REGULATION 710-1 PDF

Army Regulation –1. Inventory Management. Centralized. Inventory Management of the Army Supply System. Headquarters. Department of the Army. scope: Purpose. This regulation prescribes Department of the Army (DA) policies, responsibilities, and procedures for integrated inventory management of Army. scope: Purpose. This regulation prescribes Department of the Army (DA) policies and responsibilities for integrated inventory management of Army materiel.

Author: Goltiktilar Metaxe
Country: South Sudan
Language: English (Spanish)
Genre: Technology
Published (Last): 18 November 2014
Pages: 497
PDF File Size: 13.82 Mb
ePub File Size: 18.34 Mb
ISBN: 521-4-19667-848-8
Downloads: 41491
Price: Free* [*Free Regsitration Required]
Uploader: Nezil

Process non-qualifying items with a demand frequency of three or more per year offline for review as numeric stockage objective NSO or insurance candidates. Do not duplicate existing commercial distribution capabilities unless necessary, cost effective, and responsive regulatjon. The strategically positioned equipment can be used anywhere in the world to support multiple Combatant Commanders.

War Reserve Secondary Item Process, page Use the procurement economic cutback model along with IM knowledge of programmatic, acquisition and logistics factors to determine the cost benefit of reducing or canceling awarded procurement due-in.

Use the latest independent demand history as a foundation for developing an independent demand forecast in LMP.

The approval will be for the combined supply actions.

When the logistical transfer is to an item manager within the same military Service, the SPR record is forwarded. Requirements and Demand Forecasting.

Deputy Chief of Staff, G—8. Hard target requirements 5-year forecastpage 31 Table 3—4: However, a few of these items must be stocked because if they did fail, their non-availability and long procurement lead times would significantly affect the readiness of the essential weapon systems or regluation items.

The container does not meet criteria for condition codes A, E, F, reulation P. Maintain warfighting capability and readiness while improving training ammunition distribution.

  HTR-5740 MANUAL PDF

AR –1 – AKO US Army

Inventory Management Control Programs, page They provide a basis for approving requirements, planning distribution, and allocating assets. Acquisition is not authorized for terminal items. Excess ammunition assigned totest projects will be turned in or identified as such to the ASP.

The contractor should deliver these data to the Government in a format compatible with the automated system used in the regukation determination process. POC for the model is. Base the response time for DOD components on the last order deadline given to the IMM by the manufacturer of the item.

Operations and maintenance, Army appropriated funds. WRSA stockpile replaces allied combat regulatiob and combat consumption only.

The PDT is the number of days between contract award and first significant contract delivery generally Except for major weapon systems and communications-electronic systems containing embedded COMSEC devices, all classified COMSEC materiel, unclassified controlled cryptographic items and cryptographic high value property are stocked, stored, overhauled, issued, and disposed of by Tobyhanna Army Depot for all condition codes.

Provide overall staff supervision for type classification TCmaterial release, fielding and transfer of major.

Consider these condemned assets potential DOD excess in stratification reports of on-hand inventories. Use the NSN assigned to the end item undergoing. This is done by comparing the cost related to stockage versus non-stockage but later needing it.

AR 710-1 Centralized Inventory Management of the Army Supply System

Section II Responsibilities 1—4. 710- to gross effectiveness, but only counts customer orders for NSNs that each DDD depot has previously planned to stock. As the Program Manager for Instrumentation, Targets, and Threat Simulators ITTSmanage the research, development, design, acquisition, fielding, modification, and capability accounting of targets used for development and operational test and evaluation and training for the Army.

  BONFIGLIOLI GEARBOX CATALOGUE PDF

ARI criteria apply if—.

Non-Army Managed Item Program. Clothing, textiles, heraldry, and subsistence. The end item manager will validate maintenance requirements or GFM requirements before 170-1 them to.

With the transfer of DLR procurement responsibility to the DLA, planning and executing new sustainment acquisition strategies will be a Joint effort between the Army, the DLA, the Defense Contract Management Agency, and other services with a supply interest in the impacted item s. As soon as the situation permits, the action taken will be reported through command channels to the Armt. Emphasize and incentivize production delay time reductions with all new part manufacturers.

The three CONUS SDPs serve as geographical distribution hubs from which scheduled delivery trucks as shipment volumes and distance allow supply Army installations within the footprint of each hub.

Appropriation and budget activity account code position 2 of the materiel category code for Army working capital fund items, page If there is a requirement, the assemblyor component manager indicates the quantities of the prime and related NSNs, the minimum acceptable condition code, related item technical data, and condition inspection criteria if applicable. This criterion should be applied to the item itself and not to a part or component because that part or component has application in a higher assembly, equipment or weapon which is considered unstable.

Critical—asset position below requirements objective. It will also provide unserviceable and serviceable returns data.